国产一区二区极品_天堂资源中文WWW_国产成人精品av_黄色国产精品_日韩欧美福利_中文字幕欧美在线

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

Technical Services Current Position:Home > Technical Services

Precautions for GCL construction

Release time:2020-4-7    This article is read :5674 Times

GCL construction

Precautions for GCL construction

1. The site should be kept relatively dry during construction, and the base surface can be wet, but there should be no water accumulation.

2. The laying, connection and interface of the GCL should meet the design requirements and construction specifications, and be firm and stable, without hollowing, damage, slippage, warping, wrinkling and other phenomena.

3. If the impermeable blanket is damaged during the laying process, a pair of GCLs larger than the damaged surface by 30cm ~ 50cm must be cut and covered, and the surrounding area should be coated with bentonite waterproof slurry. 4. After the GCL is laid and inspected, the construction of backfill shall be carried out simultaneously to avoid trample and damage.

5. The GCLs should be stacked in the designated place on the site, and be cushioned to maintain a certain distance from the ground, and covered with plastic film to avoid rainwater immersion, sunlight and moisture.

6. If it rains during the construction process, it should be covered immediately with plastic film materials or rain shielding materials to avoid rainwater soaking and washing the waterproof layer and affecting the construction quality. When the rain is large and the bentonite swells by more than 300%, it should be laid again.

7. The equipment or truck cannot be placed directly on the GCL, and the cover must be set to work.

8. When laying, it is strictly forbidden to put an open flame or cigarette butt on any side of the GCL, and it is strictly forbidden for construction personnel to wear spike shoes.

9. During the construction, if the construction party encounters unclear drawings or the construction site does not conform to the design of the drawings, it should be notified to the designer in time and properly resolved through consultation.

10. For other unfinished matters, the national and local acceptance standards and operating specifications shall be followed during construction.

Precautions for GCL construction
Previous:Comparative analysis of several geotextile materialsnext:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.dgjura.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 啊灬啊灬啊灬快灬高潮少妇 | 亚洲色无色A片一区二区 | 亚洲日韩av无码一本到 | 成人性视频免费网站在线 | 欧美色窝79yyyycom | 日本三级吃奶头添泬播放 | 亚洲成a人片在线不卡一二三区 | 日韩免费区 | 天天躁日日躁狠狠的躁天龙影院 | 久一国产 | 免费日本黄色片 | 日本大片免a费观看视频+播放器 | 国产精品粉嫩av | 一本伊大人香蕉久久网手机 | 日本网站免费观看 | 成人爱爱| 日韩片在线| 99国内精品久久久久 | 熟女少妇在线视频播放 | 国精无码欧精品亚洲一区 | 欧美伊人精品成人久久综合97 | 视频一区二区无码制服师生 | 性色av无码免费一区二区三区 | 国产精品久久久999 色婷婷av一区二区三区小说 | 美女视频免费是黄的网站高清 | 97夜夜澡人人爽人人 | avtom影院永久入口满18 | 免费看黄网站大全 | 天天做天天爱夜夜爽导航 | 久久久久久色 | 一级黄色毛片播放 | 国产精品网在线观看 | 美女131爽爽爽做爰视频 | 国产乱码精品一品二品 | 久久东京 | 在线视频观看 | 91狠狠狠狠狠狠狠狠 | 99久久久精品免费观看国产 | 欧美极品少妇性运交 | 亚洲一级色片 | 已婚丰满少妇21P |