国产一区二区极品_天堂资源中文WWW_国产成人精品av_黄色国产精品_日韩欧美福利_中文字幕欧美在线

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :4430 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.dgjura.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 国产成人精品999在线观看 | 国产乱码精品一区二区三区麻豆 | 国产成人女人在线观看 | 亚洲成年人在线 | 国产色欲色欲色欲WWW | 国产999精品久久久久久 | 亚洲黄色在线视频 | 国产精品久久久久久久稀缺资源 | 久久99婷婷国产精品免费 | 国产麻豆精品95视频 | 夜夜操天天操 | 日本系列1页亚洲系列 | 国产一精品一aⅴ一免费 | 精品久久久久久久久久国产潘金莲 | 岳好紧好湿夹太紧了好爽矜持 | 嫩草91在线 | 美女18禁裸乳裸体无遮挡的网站 | 亚洲精品国产精品国自 | 国产校花精品av | 久久精品国产68国产精品亚洲 | 久久69精品久久久久久国产越南 | 无码AV中文字幕出轨人妻 | 亚洲精品字幕 | 69久久国产露脸精品国产 | 亚洲巨乳自拍在线视频 | 国产美女被遭强高潮免费 | 91新婚少妇在线播放 | 91久久极品少妇xxxxⅹ软件 | 老熟妇乱子交视频一区 | 99riav.6国产情侣在线看 | 国产麻豆高潮流白浆喷水免费网站 | 欧美黑人性受 | 学生妹av | 国产黄频 | 丰满老熟女毛片 | 香蕉成人国产精品免费看网站 | 国产99视频精品免费观看9 | 日本一级特黄录像视频播放 | 国产成人片在线观看永久观看 | 免费a片在线网站大全 | 中文字幕人成无码免费视频 |