国产一区二区极品_天堂资源中文WWW_国产成人精品av_黄色国产精品_日韩欧美福利_中文字幕欧美在线

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :4430 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.dgjura.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 日本一区二区三区免费A片 欧美亚州综合 | 久久久国产亚洲精品 | 亚洲成av人片| 日本一区二区三区网站 | 免费看裸体美女脱了衣服露视频胸 | 日韩精品一区在线播放 | 精品色999 | 日韩欧美高清DVD碟片 | 日本黄色影视 | 种付おじさんと在线观看 | 日韩精品久久久毛片一区二区 | 日本aaaa片毛片免费观看视频 | 看国产成人h片视频 | 成人影院在线观看 | 少妇伦子伦精品无吗在线观看 | 久久久久久国产精品美女 | 日本天天躁狠狠躁噜噜噜 | 狠狠插网站 | 国内精品伊人久久久久AV | 欧美精品精品一区 | 大白天情侣对白肉麻的很 | www.999精品 | 欧美无毛大片 | 999ZYZ玖玖资源站永久 | 国产放荡对白视频在线观看 | 国产盗摄一区二区三区在线 | 人妻偷人VA精品国产旡码 | 亚洲国产综合精品中文第一 | 日日操日日干 | 久久成人免费网 | 成全视频在线观看免费高清在线观看 | 成人a在线视频免费观看 | 国产毛片毛多水多的特级毛片 | 天天爱天天做天天爽2021 | asiantube性ass富婆 | xxx欧美xxx | 国产精品186在线观看在线播放 | 精品久久久久久中文字幕2017 | 成全视频在线观看免费高清在线观看 | 国产午夜精品视频免费不卡 | 国产乱码精品一品二品 |